Four different types of Runxin automatic softener valves.

Runxin Automatic Softening Valves para sa Epektibo at Cost Saving Softening Systems

Runxin awtomatikong malambot na valve Ay ang pangunahing controller ng sistema ng malambot ng tubig, ang pangkalahatang proseso ng operasyon ay: tumatakbo, backwash, brine, mabagal na paghuhugas, brine refill, wash.

Ang Runxin softener control valve, LED o LCD display screen, ay sumasaklaw sa 1-50m3/H produksyon ng tubig, Ito ay malawak na ginagamit sa mga bahay, kumpanya, pabrika, paaralan, tropa at iba pang lugar para sa tubig na malambot, na may malakas na paggamit at praktikal.

  • Specification
  • Proseso ng Trabaho
  • Mga tampokan
  • Videos
Specification
Higit pa basanMas Mababasa
Table 1: Popular Models & Data Sheet of Runxin Automatic Softener Control Valves.
Modelo Kapasidad ng tubig Running Modelo Type ng Regenerasyon Type ng bunko Inlet/Outlete Drain Brine Tank Connector Base Riser Pipe Kakaibang Tank sizes Working Pressure Temperatura ng tubig Turbidity Input Charge Output Charge
63502 (F65B1) 2 m3/H Oras oras Downflow Itaas ang Bunko 3/4"F 1/2"M 3/8"M 2.5"-8NPSM 1.05 "O.D. 6 "–10" 0.15–0.6 MPa 5–45 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
63602 (F65B3) Meter
63502B (F65G1) 2 m3/H Oras oras Downflow Itaas ang Bunko 3/4"F 1/2"M 3/8"M 2.5"-8NPSM 1.05 "O.D. 6 "–10" 0.15–0.6 MPa 5–45 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
63602B (F65G3) Meter
73502 (F69A1) 2 m3/H Oras oras Upflow Itaas ang Bunko 3/4"F 1/2"M 3/8"M 2.5"-8NPSM 1.05 "O.D. 6 "–10" 0.15–0.6 MPa 5–45 °C < 2 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
73602 (F69A3) Meter
73502B (F69G1) 2 m3/H Oras oras Upflow Itaas ang Bunko 3/4"F 1/2"M 3/8"M 2.5"-8NPSM 1.05 "O.D. 6 "–10" 0.15–0.6 MPa 5–50 °C < 2 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
73602B (F69G3) Meter
63503 (F117A1) 2 m3/H Oras oras Downflow Itaas ang Bunko 3/4"F 3/4"M 3/8"M 2.5"-8NPSM 1.05 "O.D. 6 "–10" 0.15–0.6 MPa 5–50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
63603 (F117A3) Meter
63504 (F63C1) 4 m3/H Oras oras Downflow Itaas ang Bunko 1"M 1/2"M 3/8"M 2.5"-8NPSM 1.05 "O.D. 6 "–14" 0.15–0.6 MPa 5–50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
63604 (F63C3) Meter
63504B (F63G1) 4 m3/H Oras oras Downflow Itaas ang Bunko 1"M 1/2"M 3/8"M 2.5"-8NPSM 1.05 "O.D. 6 "–14" 0.15–0.6 MPa 5–50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
63604B (F63G3) Meter
63504C (F63I1) 4 m3/H Oras oras Downflow Side Mounts 1"M 1/2"M 3/8"M 2.5"-8NPSM 1.05 "O.D. 6 "–14" 0.15–0.6 MPa 5–50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
63604C (F63I3) Meter
63504S (F63B1) 4 m3/H Oras oras Downflow Itaas ang Bunko 1"M 1/2"M 3/8"M 2.5"-8NPSM 1.05 "O.D. 6 "–14" 0.15–0.6 MPa 5–50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
63604S (F63B3) Meter
73504 (F68C1) 4 m3/H Oras oras Upflow Itaas ang Bunko 1"M 1/2"M 3/8"M 2.5"-8NPSM 1.05 "O.D. 6 "–14" 0.15–0.6 MPa 5–50 °C < 2 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
73604 (F68C3) Meter
73504B (F68G1) 4 m3/H Oras oras Upflow Itaas ang Bunko 1"M 1/2"M 3/8"M 2.5"-8NPSM 1.05 "O.D. 6 "–14" 0.15–0.6 MPa 5–50 °C < 2 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
73604B (F68G3) Meter
73504S (F68A1) 4 m3/H Oras oras Upflow Tutaas bundok na may kamaywheel 1"M 1/2"M 3/8"M 2.5"-8NPSM 1.05 "O.D. 6 "–14" 0.15–0.6 MPa 5–50 °C < 2 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
73604S (F68A3) Meter
63505 (F116A1) 4 m3/H Oras oras Downflow Itaas ang Bunko 1"M 3/4"M 3/8"M 2.5"-8NPSM 1.05 "O.D. 6 "–14" 0.15–0.6 MPa 5–50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
63605 (F116A3) Meter
63505E (F116E3) 5 m3/H Meter Downflow Itaas ang Bunko 1"M 3/4"M 3/8"M 2.5"-8NPSM 1.05 "O.D. 10 "–20" 0.15-0.6 MPa 5-50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
63605E (F130A3) 5 m3/H Meter Downflow Itaas ang Bunko 1"M NPT 3/4" 3/8"M 2.5"-8NPSM 1 "D-GB 7 "–22" 0.15–0.6 MPa 5–50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
73505 (F92A1) 4.7 m3/H Oras oras Upflow Itaas ang Bunko 1"M 3/4"M 3/8"M 2.5"-8NPSM 1 "D-GB 9 "–16" 0.15–0.6 MPa 5–50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 12V/2.0A
73605 (F92A3) Meter
73605E (F92E3) 5 m3/H Meter Upflow Itaas ang Bunko 1"M NPT 3/4" 3/8"M 2.5"-8NPSM 1 "D-GB 7 "–22" 0.15–0.6 MPa 5–50 °C < 2 FTU AC 100V – 240V / 50–60 Hz DC 12V/1.5A
63508 (F133A1) 8 m3/H Oras oras Downflow Itaas ang Bunko 1.5"M 3/4"M 1/2"M 4"-8UN 1.25 "D-GB o 1.66" O.D. 16 "–18" 0.2–0.6 MPa 5–50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 24V/1.5A
63608 (F133A3) Meter
63510 (N74A1) 10 m3/H Oras oras Downflow Itaas ang Bunko 2"M 1"M 1/2"M 4"-8UN 1.5 "D-GB o 1.9" O.D. 20 "–21" 0.2–0.6 MPa 5–45 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 24V/1.5A
63610 (N74A3) Meter
63510B (N74B1) 10 m3/H Oras oras Downflow Top/Side Mount. 2"M 1"M 1/2"M 4"-8UN 1.5 "D-GB o 1.9" O.D. 20 "–21" 0.2–0.6 MPa 5–45 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 24V/1.5A
63610B (N74B3) Meter
63515 (F99A1) 15 m3/H Oras oras Downflow Top/Side Mount. 2"M 1.5"M 3/4"M 4"-8UN 1.5 "D-GB o 1.9" O.D. 30" 0.2–0.6 MPa 5–50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 24V/1.5A
63615 (F99A3) Meter
73515 (F99D1) 15 m3/H Oras oras Upflow Top/Side Mount. 2"M 1.5"M 3/4"M 4"-8UN 1.5 "D-GB o 1.9" O.D. 30" 0.2–0.6 MPa 5–50 °C < 2 FTU AC 100V – 240V / 50–60 Hz DC 24V/1.5A
73615 (F99D3) Meter
63518 (N77A1) 18 m3/H Oras oras Downflow Top/Side Mount. 2"M 1.5"M 3/4"M 4"-8UN 1.5 "D-GB o 1.9" O.D. 30 "–36" 0.2–0.6 MPa 5–50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 24V/1.5A
63618 (N77A3) Meter
63520 (F95A1) 21.6 m3/H Oras oras Downflow Side Mounts 2"M 1.5"M 3/4"M - Side mount, itaas at ibaba distributor 2"M 36 "–40" 0.2–0.6 MPa 5–50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 24V/1.5A
63620 (F95A3) Meter
63520T (F111A1) 21.1 m3/H Oras oras Downflow Itaas ang Bunko 2"M 1.5"M 3/4"M 4"-8UN 2 "D-GB 36 "–40" 0.2–0.6 MPa 5–50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 24V/1.5A
63620T (F111A3) Meter
73520 (F95D1) 21.6 m3/H Oras oras Upflow Side Mounts 2"M 1.5"M 3/4"M - Side mount, itaas at ibaba distributor 2"M 36 "–40" 0.2–0.6 MPa 5–50 °C < 2 FTU AC 100V – 240V / 50–60 Hz DC 24V/1.5A
73620 (F95D3) Meter
63540B (F112A1) 40 m3/H Oras oras Downflow Side Mounts DN65 DN65 3/4"M - Side mount, itaas at ibaba distributor DN80 40 "–48" 0.2–0.6 MPa 5–50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 24V/4.0A
63640B (F112A3) Meter
63550 (F96A1) 50 m3/H Oras oras Downflow Side Mounts DN80 DN80 3/4"M - Side mount, itaas at ibaba distributor DN100 60 "–63" 0.2–0.6 MPa 5–50 °C <5 FTU AC 100V – 240V / 50–60 Hz DC 24V/4.0A
63650 (F96A3) Meter
Proseso ng Trabaho

Ang flow ay batay sa nakaayos na sistema ng malambot sa kama.

  • Stage 1: Regenerate (Manual Backwash)

    Magsimula ng proseso ng backwash, ang raw water ay pumasok sa mga control valves mula sa tubig inlet at pumasok sa FRP tanks kasama ang gitnang tubo at ilalim na distributor. Pagkatapos ang mga resins na lumulutan sa ilalim ng presyon ng tubig at ang mga impurities ng resin ay inalis kasama ang tubig, pagkatapos ang tubig ay magpapalabas kasama ang pinakamataas na distributor at paglabas port.

  • Stage 2: Regenerated

    Ang raw water ay pumasok sa control valve mula sa tubig inlet at pumasok sa brine ejector. Ang tubig ay dumadaloy patungo sa ejector outlet sa isang mabilis na bilis at gumagawa ng negatibong presyon. Ang brine ay iginuhit sa mga tanks at flows sa pamamagitan ng resin layer kasama ang gitnang tubo at ibaba na distributor upang makamit ang pagbabago ng resin .. Pagkatapos ang bihirang tubig ay paglabas mula sa port ng paglabas.

  • Stage 3: Slow wash

    Ang ball ball brine ay sarado, pumapasok ng tubig sa control valve mula sa inlet at pumasok sa mga tanks sa pamamagitan ng ejector at patuloy na mabagal na paghuhugas ang layer ng resin kasama ang gitnang tubo at patuloy Ibabang distributor upang alisin ang impurities ng resin at brine. Pagkatapos ang tubig ay paglabas mula sa port ng paglabas.

  • Stage 4: Wash

    Pumasok ang tubig sa control valve mula sa inlet at pumasok sa mga tanks sa pamamagitan ng top distributor at flows patungo sa resin layer na may malaking bunko tubig upang lubos na flush ang resin layer at residual brine, pagkatapos ang impurities at residual brine ay maglabas mula sa paglabas ng port.

  • Stage 5: Pagpuno ng tubig at malambot

    Ang raw water ay pumasok sa control valve sa pamamagitan ng inlet at brine ball valve na binuksan sa parehong oras. Ang tubig ay pumasok sa tangke ng brine at punan ang tubig. Kapag nakumpleto ang pagpuno, ito ay magiging bituin sa malambot. Ang raw water ay pumapasok sa control valve mula sa water inlet at pumasok sa FRP tank at resin layer sa pamamagitan ng pinakamataas na distributor, ang malambot na tubig ay flow kasama ang gitnang tubo at drainage mula sa outlet. Ang proseso ng malambot ay kumpleto.

Automatic filter valve working and it's matched position.
Mga tampokan
  • Mga Katangian ng istruktura at Pagganap
    • LED display, indikasyon ng mahabang panahon na power off at data na nakaligtas pagkatapos ng power off (Saved sa loob ng tatlong araw).)
    • Walang hard water bypass sa tumataas na siklo.
    • Sa signal output connector at dalawang mode (b-01 o b-02) ay opsyonal.
    • Maaaring i-set ang pag-runing frequency F-00, na napagtanto ang isang oras na serbisyo at ilang beses ng backwash at mabilis na rinse.
    • Sa remote control connector upang makatanggap ng mga passive signal.
    • Sa interlock connector upang malaman ang serbisyo sabay-sabay at linse isa sa pamamagitan ng isa.
    • Magsimula ng pagtaas ng mga araw o oras.
    • Ang N77, F95 at F111 ay may dalawang valve cores, ang isa ay para sa pagkontrol ng inlet water, ang isa ay para sa outlet water.
    • Ang uri ng oras o uri ng metro ay opsyonal.
    • N77/F95 na may RS-485 port ay optional.
  • Mga application
    • Residential Softener Systems (F63/F65/F68/F69).
    • Softener para sa RO pretreatment System.
    • Boiler Softening System, lon exchange system.
  • Repark
    • Ang modelo na may "S" ay nangangahulugan ng valve na may manual operasyon.
    • N77,F95, F111 brine refilled habang ang serbisyo, brine refilling kontrolado ng electronic ball valve.
    • Ang F63, F65, F68 at F69 ay may iba't ibang mga hitsura na opsyonal.
    • Ang N74B ay opsyonal na maaaring itaas o side-mount.
Mga videos
Downloads

Narito ang katalogo ng produkto at data sheet para sa iyong reference. Higit pang impormasyon ay makipag-ugnay sa amin.

The nuonuo is answering the phone.
Interesado?
Mga Related Systems